ћир    lat    eng    рус     A A A     Print    Rss
MENU
Home » Quality control on Končulj Singerit project
07.10.2019.

Quality control on Končulj Singerit project

  Quality control on Končulj Singerit project    Quality control on Končulj Singerit project

In the period 2-3 October 2019,  Mine Action Center carried out quality control at a part of the “Končulj – Singerit” site, Bujanovac Municipality, searched and demined by Contractor Stop Mines, Pale, Bosnia and Herzegovina, in accordance with the MAC Project, International Mine Action Standards and Standard Operating Procedures.

Quality control was carried out by manual method and by the use of mine detection dogs (MDDs).

Critical errors determined by this Project have not been established.

  Quality control on Končulj Singerit project    Quality control on Končulj Singerit project