MENU
Home » QUALITY CONTROL ON TURIJSKA BRDA PROJECT
02.09.2019.
QUALITY CONTROL ON TURIJSKA BRDA PROJECT
Оn the Demining Project of the Turijska Brda location, Municipality of Bujanovac, totalling 389.200 sqm, оn 30 August 2019, the Mine Action Centre performed quality control on the part of the location that was demined manually in accordance with the Centre’s project, International Mine Action Standards (IMAS) and Standard Operating Procedures of Contractor N.G.O. IN Demining, Pale, Bosnia and Herzegovina.
The control was performed by the method of random samples of demined area, i.e. 3% of the total area.
The area where quality control of demining was performed has been accepted as cleared and considered safe by IMAS (99.65%).