Quality control on ERW clearance project of areas in the zone of the bridge at Sremska Rača and along
planned route of Belgrade - Sarajevo highway,
Sremska Rača - Kuzmin section
In the period 28-29 April 2021, SMAC representatives conducted quality control on the parts of the ERW clearance project of areas in the zone of the bridge at Sremska Rača and along planned route of Belgrade - Sarajevo highway, Sremska Rača - Kuzmin section.
On the 28th April 2021, quality control of the part оf Phase 1 was conducted. Within Phase 1, contractor "Millennium Team" Ltd., Belgrade, searched and cleared the area to a depth of 50 cm. The area subjected to quality control totalled 145.000 sqm.
On the 29th April 2021, quality control of the parts оf Phases 2 and 3, which comprise depth recording of the terrain from 1.5m to 6 m, was conducted on the area of 233.850 sqm.
Quality control of the mentioned parts of Phases 1, 2 and 3 established that there are no ERWs or anomalies indicating the existence of an object of the mass within the limits of the critical error determined by the Project.