ћир    lat    eng    рус     A A A     Print    Rss
MENU
Home » MDD QUALITY CONTROL ON TURIJSKA BRDA PROJECT
29.08.2019.

MDD QUALITY CONTROL ON TURIJSKA BRDA PROJECT

 MDD QUALITY CONTROL ON TURIJSKA BRDA PROJECT“

On 29 August 2019, on the Demining Project of the Turijska Brda location, Municipality of Bujanovac, totalling 389.200 sqm, in accordance with the Centre’s project, International Mine Action Standards (IMAS) and Standard Operating Procedures of Contractor N.G.O. IN Demining, Pale, Bosnia and Herzegovina, the Mine Action Centre performed quality control on the part of the location that was treated by mine detection dogs.

 MDD QUALITY CONTROL ON TURIJSKA BRDA PROJECT“

Furthermore, quality control was carried out on the part of the location treated by MDDs.